16 September 2016
RTAF A340-500 aircraft (photo : TAF)
Former THAI A340-500 completed the test flight after the retrofit and painting. The 4-engines airliner will be commissioned in the 602 sq. (Royal Guard) as the RTAF new transport aircraft.
A340 will be operated in the 603 sqn for personal transport.
(TAF)
RTAF A340-500 aircraft (photo : TAF)
Former THAI A340-500 completed the test flight after the retrofit and painting. The 4-engines airliner will be commissioned in the 602 sq. (Royal Guard) as the RTAF new transport aircraft.
A340 will be operated in the 603 sqn for personal transport.
(TAF)